Underground Sewer & Utility Installation

Sanitary sewer, storm drainage, and utility trenching for a multi-unit commercial site, installed to civil drawings and municipal inspection hold-points.

Site Overview

Scope:

We installed sanitary sewer and storm lines, set manholes and catch basins, and trenched for the site utilities that feed a multi-unit commercial building. Every run was laid to the slopes and invert elevations on the civil set, then inspected before backfill.

Why it mattered:

Underground work is expensive to reopen. The lines had to pass inspection the first time and sit deep enough that later paving and landscaping would not crush or shift them.

Get a free quote

4.9 Google Rating

The Challenge

Site conditions:

The storm run crossed an existing gas main, and the sanitary service had to pick up a tight invert at the municipal tie-in. Trench depth also meant shoring, not just an open cut.

The Approach

How we handled it:

Locates were marked and the gas crossing was exposed with hydro excavation before the sewer trench opened. Pipe was bedded on gravel, joints checked, and each manhole left accessible for the inspector. Backfill and compaction followed only after the hold-point cleared.

Completed projects

Call us now

Service Areas

Proudly Serving
Calgary & Area

Based in Calgary, our crews take on commercial excavation, utility, paving, and land development projects throughout Southern and Central Alberta.

Calgary

  • Downtown
  • Beltline
  • Inglewood
  • Kensington
  • Bridgeland
  • Sunalta
  • NW Calgary
  • NE Calgary
  • SE Calgary

Calgary Metro

  • Airdrie
  • Cochrane
  • Chestermere
  • Okotoks
  • High River
  • Strathmore
  • Crossfield
  • Irricana
  • Langdon

Southern Alberta

  • Red Deer
  • Lethbridge
  • Medicine Hat
  • Canmore
  • Olds
  • Innisfail
  • Brooks
  • Taber
  • Claresholm

4.9 Star Rating

FAQ

Frequently Asked Questions About This Utility Work

Everything you need to know before starting your next project with Altera Construction.

Do you coordinate municipal inspections?

Yes. Inspection hold-points are built into the schedule so trenches are not backfilled before the city or engineer signs off.

Can you work next to live utilities?

Yes. We expose known lines with hydro excavation and trench beside them once the crossing is confirmed.

What pipe materials do you install?

Whatever the civil drawings specify — typically PVC or HDPE for sewer and storm on commercial sites, with the fittings and bedding called out in the spec.

How deep were the trenches on this job?

Depth followed the invert elevations on the drawings. Deeper runs were shored; shallower service laterals were sloped and benched to soil conditions.

Will the surface be restored after trenching?

Yes. Trenches are backfilled and compacted to the specified density, then the surface is restored to the next trade or finished if paving is in our scope.