Commercial Excavation for a New Retail Site

Site clearing, bulk excavation, and grading for a ground-up retail pad, sequenced so foundation work could start on a stable, drained grade.

Site Overview

Scope:

The lot had to go from raw ground to a construction-ready retail pad: clearing, bulk excavation, and rough grading to the civil elevations, with spoil hauled off and the remaining soil compacted before the foundation crew mobilized.

Why it mattered:

Retail pads fail later when water sits against the building or the subgrade was left loose. Getting the cut, haul, and compaction right at this stage is what keeps the parking and building elevations working together after the slab goes down.

Get a free quote

4.9 Google Rating

The Challenge

Site conditions:

Existing fill and a high corner of the lot pushed runoff toward the neighboring property. Utility locates also showed a private water line along the east edge that had to stay live while we excavated for the pad.

The Approach

How we handled it:

We cleared and cut to the design elevation in planned lifts, kept a working slope toward the future storm inlet, and used hydro excavation only where the private line crossed the pad. Compaction was tested before we released the site so the next trade was not building on guesswork.

Completed projects

Call us now

Service Areas

Proudly Serving
Calgary & Area

Based in Calgary, our crews take on commercial excavation, utility, paving, and land development projects throughout Southern and Central Alberta.

Calgary

  • Downtown
  • Beltline
  • Inglewood
  • Kensington
  • Bridgeland
  • Sunalta
  • NW Calgary
  • NE Calgary
  • SE Calgary

Calgary Metro

  • Airdrie
  • Cochrane
  • Chestermere
  • Okotoks
  • High River
  • Strathmore
  • Crossfield
  • Irricana
  • Langdon

Southern Alberta

  • Red Deer
  • Lethbridge
  • Medicine Hat
  • Canmore
  • Olds
  • Innisfail
  • Brooks
  • Taber
  • Claresholm

4.9 Star Rating

FAQ

Frequently Asked Questions About This Excavation

Everything you need to know before starting your next project with Altera Construction.

How long did the excavation take?

This pad was cleared, cut, and graded in just over two weeks, including haul-off and compaction testing. Larger sites or wet weather can stretch that.

Do you handle utility locates before digging?

Yes. Public locates are confirmed before any bucket hits the ground, and we look for private lines that a standard locate will miss.

What happens to the excavated material?

Suitable soil can be reused on-site for backfill or grading. Unsuitable fill is hauled off and disposed of properly.

Can you excavate while the neighboring site stays open?

Yes. Access, fencing, and haul routes are planned so adjacent businesses can keep operating while we work.

What do you need to quote a similar pad?

Civil drawings if you have them, a site address, and any known soil or utility notes. We can walk the site if drawings are incomplete.